Call 01924 253509 for a free consultation
clp 25 years of excellent service2

Glasgow Hospital Project – Bespoke Medical-Grade HVAC / AHU Upgrades and AHU Refurbishments

Glasgow Hospital having EC fans installed with AHU to improve energy efficiency

Discover how CLP Air Group delivered a bespoke HVAC and AHU upgrade at Glasgow Hospital, ensuring energy efficiency, compliance with HTM requirements, and minimal disruption. Project Overview With over 30 years of service, the existing air handling equipment at the hospital was becoming unreliable and no longer met modern building standards. A comprehensive solution was […]

Eden Boys Academy – Custom AHU Design and Installation

Eden Boys Academy Exterior and Rooftop Installation

Faced with an urgent equipment sourcing challenge, CLP Air Group swiftly designed, manufactured, and delivered seven custom-built AHUs for Eden Boys Academy. Meeting strict time constraints, the team ensured seamless installation via crane lift, full compliance with ERP standards, and long-term operational reliability.

Onion Processing Facility – Bespoke High Care Level Complex Demands System

Bespoke-High-Care-Demand-System Wakefield

CLP Air Group successfully delivered a bespoke air handling system for an onion processing facility, addressing the complex demands of high air change rates, food hygiene standards, and resistance to corrosive onion compounds. By integrating specialist cooling, an EC fan wall, and stainless steel casework, the system ensures optimal performance, longevity, and compliance with industry regulations.

Santander Bank. Glasgow & Sheffield – Refurbishment of Existing AHUs

A refurbished air handling unit (AHU) system in a Santander building, showcasing newly upgraded equipment designed for improved efficiency, compliance with modern building regulations, and optimised performance for updated occupancy and usage demands.

Santander faced significant challenges with their ageing AHU system, which had been part of the initial building design over 25 years ago. The equipment was beginning to fail due to age, and it no longer met current building regulations, occupancy changes, and new usage demands. The refurbishment required both upgrades to the existing system and the addition of new equipment to ensure optimal performance.