Case Studies

May 21, 2017
hazardous area ahu install

Unilever, Leeds (Hazardous Area)

This is a case study for Unilever, Leeds. Two specially designed AHU’s were provided for a new production facility. Careful […]
May 21, 2017
swimming pool ahu install

Central Swimming Pool, Reading

This is a case study for Central Swimming Pool, Reading. CLP were asked to get involved with supplying two air […]
May 21, 2017
minimal disruption to hotel ahu install

Thistle Hotel, Heathrow (Minimal Disruption)

This is a case study for the Thistle Hotel, Heathrow. The existing hotel AHU plant was ageing and starting to […]
May 21, 2017
hepa filters for food industry ahu install

Cranswick Foods, Hull (HEPA Filters)

This is a case study for Cranswick Food, Hull. Three new air handling units comprising of HEPA filters and specially […]
May 21, 2017

Hello Fresh

Four AHU’s with a total airflow capacity of 104 cubic metres per second were provided for a new food production […]
May 21, 2017

Lloyds Bank Call Centre, Leeds

In conjunction with a local contractor we were asked to look at the energy savings available by changing the belt […]
May 21, 2017

UK House, Oxford Street

Two large sectionalised AHU’s were provided as replacements for the existing roof mounted units. The units were delivered on a […]
May 21, 2017

Cadbury, Bournville

Over a two year period our site team carried out various works at the main UK base of the famous […]
May 21, 2017

Pontins Holiday Parks (Swimming Pools)

We have recently completed our third swimming pool AHU installation at three of the family holiday provider’s sites. Our team […]
May 21, 2017

Lloyds Bank, Castleford

Our maintenance team were asked to carry out a site survey at the banks high street branch. A small ageing […]
May 21, 2017

Airedale Hospital

We were asked to work with a local consulting engineer to provide a new unit for the sterile services department […]
May 21, 2017

Bradford Police Station

A new heat recovery unit was supplied for the existing roof top plant room. The unit comprised of electric frost […]
May 21, 2017

St Andrews Golf Club House

Three units were provided. Units were fitted with specially designed sand louvres due to the local environment. The units were […]
May 21, 2017

Southport Hospital

We completed five projects at the hospital over a two year period with all units to HTM specification. One project […]
May 21, 2017

York University

Five AHU’s were provided for a new build project. The units ranged in size from 0.6M3/s to 4.0M3/s and each […]
May 21, 2017

Adelphi Hotel, Liverpool

Twelve units were supplied for the major redevelopment of the city centre hotel. The major stipulation for this project was […]
May 21, 2017

Brighton Police Station

A new air handling unit and controls package was supplied to serve the custody suite. The unit was located in […]
May 21, 2017

Ladywell Leisure Centre

We were asked to work with a regular client to provide six units to replace the existing aged swimming pool […]
May 21, 2017

Titanic Quarter, Belfast

Three new AHU’s were supplied for this new development at the heart of the financial / banking district in Belfast. […]
May 21, 2017

Essex Clean Room

One of our regular contractors was asked to install a competitors specified AHU on a pharmaceutical clean room project. Due […]
May 21, 2017
international heating coil ahu installation

Leeds Bradford International Airport

This is a case study for Leeds Bradford International Airport who required a new heating coil and more. A new […]
April 9, 2017

Wakefield Police Station

A survey by our site team revealed a twenty five year old AHU, which was not operational and showed clear […]
April 9, 2017
private sector ahu install

Barnsley Magistrates Court

This is a case study for Barnsley Magistrates Court A private sector AHU install project. We were asked to work […]