
CLP Air Group provided three high-performance AHUs for Aldi’s new distribution centre, ensuring optimal ventilation, energy efficiency, and seamless on-site assembly.
CLP Air Group was approached by a client regarding a large-scale project for a new distribution centre for supermarket giant Aldi. Given the project’s long-term nature, meticulous planning and design were required. Over a six-month period, various design considerations and concepts were evaluated and finalised for approval. Due to the large space and high personnel deployment, significant air volumes were necessary to meet ventilation, air change rates, and temperature regulation requirements.
Our team worked closely with the client to design a system that would provide optimal airflow and energy efficiency while accommodating the distribution centre’s scale and layout. The AHUs had to be designed in specialist-sized modules to facilitate installation in restricted areas, ensuring a seamless on-site assembly.
The newly installed AHUs now provide the Aldi distribution centre with efficient, high-volume air handling, ensuring optimal ventilation and temperature control for the extensive facility. The modular design approach allowed for seamless integration despite spatial constraints, meeting the client’s long-term operational and energy efficiency goals.
“Great service by the CLP team in overcoming challenging site conditions and logistical challenges. All works carried out to a high standard.”
Unit B & C Kirkgate Business Centre, Chantry Bridge, Wakefield, WF1 5DL • 01924253509
Copyright ©
CLP Air Group Ltd. CLP Air Group Ltd is registered in England & Wales: No. 03772225.
Website made in Yorkshire with care by Marmalade Digital