
An onion processing plant required a high-care AHU system resistant to corrosion. CLP Air Group delivered a bespoke, energy-efficient solution ensuring hygiene and long-term performance.
An onion cutting and packaging plant required a bespoke air handling system that could address several critical challenges, including a high ventilation air change rate for both staff and food hygiene standards. Additionally, the system needed to withstand the corrosive effects of onion compounds, ensuring long-lasting performance in a demanding environment.
CLP Air Group collaborated closely with the client and a food industry specialist contractor to design a custom AHU system that could meet the plant’s specific needs. The project required careful consideration of both the high air change rate for hygiene and the protection of the internal AHU casework and components from the corrosive effects of onion molecules.
The completed system provides reliable and efficient air handling, effectively managing air quality and temperature control while preventing corrosion. The solution ensures the onion processing facility operates in compliance with food hygiene standards while offering a long-lasting and energy-efficient system tailored to the challenging environment.
“Once again we collaborated with CLP Air Group on this challenging project. Great cooperation and dialogue helped to deliver a quality product and service.”
Unit B & C Kirkgate Business Centre, Chantry Bridge, Wakefield, WF1 5DL • 01924253509
Copyright ©
CLP Air Group Ltd. CLP Air Group Ltd is registered in England & Wales: No. 03772225.
Website made in Yorkshire with care by Marmalade Digital